EngyBrick Distributed Intelligent Power Monitoring Module
EngyBrick System is about smart power distribution modules solution, which are dedicated to assisting clients improving their working efficiency and greatly reducing their asset purchase budget and installation cost, providing users the best convenient installation mode and the best time-saving commissioning mode. The system consist of communication signal acquisition&voltage monitoring, current monitoring two parts. The system adopt independent bus power supply mode, RJ45 port connecting with each component modules. Its commissioning adopts one-key mode for address configuration in the field. it also can configure the parameters and the module working mode via the display screen.
Description:
Advantage:
● Modular design, Din-rail installation, suit for compact and dense distribution transformation installation environment.
● Current transformer use external connection mode(Split core or Non-split core optional),convenient for maintain.
● Easy installation and testing, reduce work intensity and work time.
● Standard port for create network wire connection,save auxiliary costs.
● It can realize full power monitoring on electric distribution circuit and 2-31 harmonic monitoring.
● EBT12 are split-core type current transformers in design , which can realize online installation without power off, and energy accuracy is of 0.5%.
● The module is of small size so that the monitoring point is installed nearby.
● Din-rail amount design, easy installation and shortened construction period.
● Suitable for multi-point central monitoring deployment.
Application:
● Industrial Distribution Automation System
● Energy Management System
● Substation Automation System
● Intelligent Building Electrical Engineering
● Power plant auxiliary power system
● High and low voltage switch-gear
Specification | Details |
---|---|
Measurement Characteristics Accuracy |
|
Voltage Measurement |
|
Communication Characteristics (EngyBus) |
|
Mechanical Characteristics |
|
EBUC10 Communication & Voltage Module |
|
EBI12 Current Module |
|
Working Surroundings |
|
Hareware Configuration List |
|
Note | When it requires increase the monitoring power meter, then user only need to increase the current module and current transformer module. One EBUC10 and one EBP10 can maximum master 32 pieces of EBI12 which equivalent to 32 pcs of three-phase power meter. |
Optimize Your Industrial Efficiency Today
Unlock unparalleled productivity and efficiency with Third Eye Automation’s cutting-edge solutions. Contact us to learn more.
"*" indicates required fields